Chain bridge construction challenge (Rousse)

The core of the challenge was to cross the narrow chain bridge. This would have been achievable had the task not also required the construction of sections of the deck as you made your way across.

I simply did not have the strength to position the planks, and the moment that I glanced down and clocked the depth of the ravine, I was toast.

Advertisement
This entry was posted in Uncategorized and tagged , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s